Catch DeficienciesBefore They're Covered Up.
Builders work fast. Problems get buried behind drywall, under slabs, and above ceilings before anyone notices. A phase inspection catches deficiencies while there's still time to fix them โ before your builder's warranty expires and the cost becomes yours.
- Pre-pour foundation & slab inspection
- Framing, rough-in plumbing & electrical
- Insulation & sheathing review
- Pre-drywall mechanical inspection
- Final walk-through inspection
- 11-month warranty inspection available
- Builder-independent, unbiased findings
- TREC-compliant report documentation
- Photo-documented Spectora reports
- Available for all Southeast Texas builders
Inspection at Every Critical Stage.
New construction deficiencies are easiest โ and cheapest โ to correct before the next phase covers them. Troy coordinates with your build schedule to inspect at the right moment.
Phase 1 โ Pre-Pour / Foundation
Inspect the foundation form, rebar placement, grade beams, and drainage before concrete is poured. Errors at this stage affect the entire structure above.
Phase 2 โ Pre-Drywall / Framing
The most critical phase. Inspect structural framing, rough-in plumbing, electrical rough, HVAC rough, insulation, and sheathing before everything is enclosed.
Phase 3 โ Final Walk-Through
Full inspection of the completed home before closing. Evaluate all systems, finishes, appliances, grading, drainage, and builder punch list completion.
11-Month Warranty Inspection
Before your builder's one-year warranty expires, document all deficiencies and cosmetic issues still covered. This is your last chance to get repairs at the builder's cost.
Builder Dispute Documentation
Comprehensive written and photo documentation of workmanship deficiencies โ organized and clear enough to support builder negotiations or legal proceedings.
Coordinate With Your Schedule
Troy works with your build timeline directly. We schedule inspections during the right window so findings can be addressed before the next phase locks them in.
Your Builder Works Fast. Problems Move Faster.
Construction crews are under schedule pressure. Shortcuts happen. Rough-in work gets covered before the superintendent reviews it. An independent inspector working for you โ not the builder โ is your only protection.
Electrical Rough-In Errors
Missing grounds, improper bonding, and code violations that get walled in. Common in fast-paced production builds and nearly invisible after drywall.
Plumbing Rough-In Issues
Improper venting, missing cleanouts, inadequate slopes, and unapproved pipe materials. Discovered early these are simple fixes. Discovered later they're demolition jobs.
Framing Deficiencies
Missing hardware, improper spans, inadequate blocking, and structural shortcuts that affect load transfer โ all visible during framing and invisible after sheetrock.
New Construction Phase Inspection FAQ
Yes. You have the right to hire an independent inspector at any phase of construction regardless of your lender, builder, or contract. Your builder cannot legally prevent it.
In most cases, yes. Troy coordinates with builders throughout Southeast Texas regularly. If a builder refuses access, that itself is a significant red flag worth discussing with your attorney.
Pre-drywall is the highest-value inspection. This is when rough-in electrical, plumbing, HVAC, framing, and insulation are all visible and correctable. Once drywall goes up, the window closes permanently.
Yes. FTGU has inspected new construction from production builders, custom builders, and semi-custom builders throughout Jefferson, Hardin, Orange, and surrounding counties.
Yes โ and it's preferred. Troy tracks the property across phases, which means he knows what was found in Phase 1 when he arrives for Phase 2 and 3. Continuity matters in new construction inspection.
Don't Wait โ Schedule Today
Building in Southeast Texas? Get Inspected.
Available 7 days a week ยท Reports within 24 hours ยท Serving Southeast Texas since 2004
Book online ยท Choose your services ยท View available appointments